Skip to main content
Help Centre (EN) Help Centre home page
Submit a request
Sign in
Deutsch (Deutschland) Nederlands (Nederland)
  • Submit a request
  1. Help Centre (EN)
  2. zappi
  3. Installer Hub

Installer Hub

  • Compliance with the Electric Vehicles (Smart Charge Points) Regulations 2021: Legacy Charge Points
  • Changing radio frequency on myenergi devices
  • Importance of Rebooting After Fault-Inducing Tests
  • Mounting Points and Drilling Guidance for the zappi
  • Understanding the 60/70V Floating Voltage Issue with TIS Testers
  • How to Install Tamper Detection on zappi 2.1
  • Using Myenergi Devices in Off-Grid Systems
  • Understanding Why You Cannot Daisy Chain zappi Together
  • Understanding Different Types of RCDs and Their Importance in EVSE Chargers
  • myenergi Installer Test Box
  • Installer Tests to be Conducted Post-Installation, Exceeding Regulatory Requirements
  • Installation of conductor cable
  • How to Update Firmware on a Zappi 2.0 or Eddi V1 with an Installed Ethernet Adapter
  • zappi versions and "PEN Fault" detection
  • What height can a Zappi be mounted at?
  • Understanding what cable size should be used for zappi
  • Understanding and Fixing Single Phase Operation in 3 Phase Zappi Models
  • Understanding Harmonics in zappi
  • Understanding Looped Supplies: Compatibility with the zappi
© MYENERGI LTD 2025 - Registration No. 10261262 - VAT No. GB248171011